The Mayrouba-Jouret El Tormos road, bridging a gap in the valley separating both towns, was not compatible with modern traffic requirements with its steep slopes, unprotected sides and narrow lanes reduced to three meters in some areas. Rehabilitation studies were conducted for the 12 km road recommending significant land expropriation to develop an 8 m road shoulder. In light of the need for an official decree approving the expropriation process, all necessary documentation were prepared, including a survey of impact on construction and on the cadastral situation. From a design perspective, the slopes have also been revised to bring them in line with AASHTO requirements, while side slopes were stabilized with rock or retaining walls.

   
  Location: Mount Lebanon, Mayrouba Lebanon
Client: Council for Development and Reconstruction (CDR)
Address: Tallet El Serail, Beirut, Lebanon - tel: +961 1 981431


  Total land surface area: 12 km long
Total built-up area: n/a
Total project cost: USD 15 million
Completion date: 2003

  Services provided: Conceptual, preliminary and final design, execution drawings, tender documents, expropriation documents