Baalbeck Sports City
Baalbeck Lebanon
Sport & Leisure
Info

The project is an extension of the existing Baalbeck Municipal Stadium and aims at converting it to a Sports City. Covering an area of around 49,283 m2, it will incorporate the following:
1. Open air playfields for basketball, Handball/Mini football, Volleyball and Tennis
2. Covered Multipurpose Hall for 1,000 persons, combining: Basketball, Volleyball, Tennis, Mini-Football and Handball games
3. Open air Olympic Swimming Pool
4. Open air Diving Pool
5. Steel canopy over the existing stadium western grandstand
6. Surface car parking for public with a capacity of around 395 cars and 7 buses,
7. Pathways and walkways connecting all the above components

   
  Location: Baalbeck Lebanon
Client: Council for Development & Reconstruction (CDR)
Address: Tallet El Serail, Beirut Tel: +961 1 981431


  Total land surface area: 98,400 m2
Total built-up area: 14,000 m2
Total project cost: USD 17 million
Completion date: 2014

  Services provided: Conceptual, preliminary design (phase 1), final design and tender documents (phase 2) (all trades)